SAGAR CONTRACTOR
ACHIEVEMENTS
01
FASTEST KILN CYCLE
-
30 minutes in DC 600*600
-
37.5 minutes in slab tiles(1200 * 1800 mm , 9mm)
-
74 minutes in 1200*1800 mm, 15 mm
02
LOWEST GAS CONSUMPTION
-
0.930-0.950 M2/M3 in DC
-
1.00-1.25 M2/M3 in GVT
03
LOWEST BODY COST
For GVT 600*1200 (1600-1650 Rs/Ton) without any side-effects and suitable for fast cycle
04
SUPER CONTRACT
Have the super contract of the PRISM JOHNSON Durgapur plant for the total plant.
05
SILICA PLANT
Running Kiln Contract GVT production at 42 minutes cycle 600*1200 mm